A strategy utilized in winter operations with the goal of preventing snow and ice from bonding to the pavement surface. This requires application of freezing point depressant material, usually a Brine, however in freezing rain events solid deicing materials may be preferred, prior to the storm and may require additional material applications during the storm event.
Source: AASHTO Winter Weather Management Technical Service Program